First Monday
Jobs
Jobs open to youOnly jobs that can hire where you liveA CV for each jobWritten from your record, every line checkedMemoryIt remembers, so you don’t repeat yourselfInterview helpResearch, prep and hints only you seeWatch how it works0:28
FAQDocsUse in AI, Free
Your countryNorth AmericaEuropeAsia-PacificLatin AmericaNot on the list? Tell us where you liveRequest early accessEarly access
First Monday

Remote jobs that can actually hire you.

Beta formacOSWindows

Jobs

Jobs open to you in CanadaRemote jobs in the USRemote jobs in PolandRemote jobs in the UKRemote jobs in CanadaRemote jobs in Mexico

Product

Jobs open to youA CV for each jobMemoryInterview helpHow it works

Company

FAQContact

Legal

Privacy PolicyTerms & Conditions
Jobs
Jobs open to you in CanadaRemote jobs in the USRemote jobs in PolandRemote jobs in the UKRemote jobs in CanadaRemote jobs in Mexico
Product
Jobs open to youA CV for each jobMemoryInterview helpHow it works
Company
FAQContact
Legal
Privacy PolicyTerms & Conditions
Remote jobs by country
United StatesPolandUnited KingdomCanadaMexicoBrazilGermanySpainPortugalIrelandNetherlandsIndiaSwedenBelgiumAustriaDenmarkFinlandSwitzerlandNorwayAustraliaNew Zealand

Remote jobs by country

United StatesPolandUnited KingdomCanadaMexicoBrazilGermanySpainPortugalIrelandNetherlandsIndiaSwedenBelgiumAustriaDenmarkFinlandSwitzerlandNorwayAustraliaNew Zealand
© 2026 First MondayNo tracking cookies. Anonymous page statistics only.
First Monday
Jobs/Education/SME Consultant – Data Center Construction

SME Consultant – Data Center Construction

Interplay Learning

Remote · USEducationPosted July 17, 2026
Open to people in the United StatesApply for this job Write my CV for this job Early access
Pay
$50–$75 an hour (B2B)
Required
Data Center Construction, G-Suite (Google Docs, Sheets, Slides), Camtasia
Benefits
Flexible hours
Tests
Trial work
Posted
July 17, 2026
Company
Interplay Learning

Who it can hire

We read the post for each of the 21 countries we cover.

  • Open to people in the US

    The employer lists this job as remote there: “Remote (United States)”.

  • Not open to people in the other 20 countries we cover, as far as the post says.

The job post

Interplay Learning, the leader in immersive learning for the skilled trades, now includes Industrial Training International (ITI), the global leader in specialized industrial learning solutions.

Leveraging instructor-led training, online simulations, AI, and VR, Interplay helps organizations and educational institutions upskill faster, reduce risk, and increase operational readiness. With nearly 600,000 people trained, Interplay is shaping the future of workforce development, building better careers and better lives.

Visit www.interplaylearning.com to learn more.

Awards & Recognition:

  • 2025, Forbes, America’s Best Startup Employers
  • 2025, Inc. 5000, Fastest-Growing U.S. Companies
  • 2024, Best Midsize Places to Work In Austin
  • 2024, Facilitiesnet Readers' Choice Award Winners for Software
  • 2024, AHR Expo Innovation Awards Winners for Software

Interplay Learning Ethos:

At Interplay, we love what we do. We embrace our daily challenge to push technological limits to invent better ways to make learning easier and training more powerful. We attract passionate people and invite spirited discourse. We celebrate that our jobs fit our lives, not the inverse. We are uncompromising in our belief that together: we can build better training, build better careers and build better lives for customers and our team.

Position: SME Consultant (Data Center Construction)

Pay: $50-75/hr (1099)

Please note this is an hourly contract position with variable hours and is not eligible for company benefits. Work is 100% remote. Some availability during business hours is needed to attend scheduled Zoom meetings.

SMEs serve as advisors to Interplay and play a key part of our growth by helping us build industry-leading training content to advance the data center industry.

At this time, we are looking for subject matter experts with direct data center construction expertise in one or more of the following areas:

  • Electrical
    • Install switchgear, transformers, generators, UPS systems, power distribution units, busways, panels, grounding, lighting, and receptacles.
  • Network and fiber
    • Install structured cabling, fiber-optic cable, telecommunications systems, access control, cameras, alarms, and building controls.
    • Terminate, splice, test, label, and certify connections between equipment rooms, racks, and network infrastructure.
  • Rack Installation
    • Assemble, position, anchor, bond, align, and label server racks, install rack accessories and prepare them for power, cabling, and IT equipment.
  • HVAC
    • Install chillers, cooling towers, air-handling units, computer room air conditioners, pumps, piping, ventilation, and controls.
  • Plumbing and Pipefitting
    • Install domestic water, drainage, fuel-gas piping, condenser-water piping, chilled-water piping, and equipment connections.

You will play a critical role on the Production Team, working with designers & developers to create and review content for skilled trades training.

Why this position:

  • Flexible work hours, remote work
  • Use your expertise to make an impact and provide education
  • Collaborative, supportive team

What you'll do:

  • Advise internal teams on industry dynamics and best practices
  • Use your expertise to support content development for VR simulations and eLearning videos
  • Advise on construction and installation
  • Develop and assist in the creation of procedure guides
  • Write and record voiceover scripts and screencasts for videos
  • Generate valid and reliable test questions/knowledge checks
  • Develop fault scenarios
  • Review courses for accuracy

Who you are:

  • Extensive knowledge of Data Center Construction
  • Teaching or training experience is preferred
  • Organized and communicative with the team
  • Desire and ability to collaborate with designers and developers and respond to queries and feedback within 1-2 business days

Requirements:

  • Extensive knowledge of subject matter
  • Systematic approach to troubleshooting
  • Research skills
  • Teaching, training or mentoring experience is ideal
  • Computer skills - G-Suite (Google Docs, Sheets, Slides)
  • Camtasia (video tutorial and presentation software), will teach
  • Writing skills for knowledge checks and procedure guides
  • Availability during business hours to attend scheduled Zoom meetings
  • We may ask you to record a video intro for the hiring team if your application looks like a potential match. Instructions will be sent.

Equal Employment Opportunity

Interplay Learning is committed to providing equal employment opportunity (EEO) to all qualified employees and applicants for employment without regard to race, color, religion, gender, sexual orientation, national origin, age, disability, pregnancy, marital status, gender identity or expression, status as a veteran, or any other legally protected characteristic or activity in accordance with applicable federal, state and local laws.

As a federal contractor, Interplay Learning takes affirmative action to consider qualified individuals without regard for disability and protected veterans status.

Individuals with disabilities who need assistance with the application or recruitment process must promptly contact the HR Department to discuss their particular needs.

Interplay Learning does not discriminate against employees or applicants for discussing, disclosing, or inquiring about compensation.

We believe in fostering a welcoming and inclusive workplace and encourage everyone to apply, regardless of background.

Our hiring decisions are guided by skills, experience, and a shared commitment to our values. If you have any questions about our process, we’re happy to provide support and guidance along the way.

First Monday isn’t the employer or a recruiter and isn’t affiliated with Interplay Learning. Details may have changed since; confirm with the employer before you apply.

Open to people in the United StatesApply for this job Write my CV for this job Early access
Pay
$50–$75 an hour (B2B)
Required
Data Center Construction, G-Suite (Google Docs, Sheets, Slides), Camtasia
Benefits
Flexible hours
Tests
Trial work
Posted
July 17, 2026
Company
Interplay Learning

Similar jobs open to people in the United States

Lead Learning Experience Designer – U.S. (30 hours/week)General Assembly · Remote · US, Canada, UK, AustraliaAI Learning & Enablement Specialist Contract OpeningAI Technology Partners · Remote · USInstructor, Microsoft AI Machine Learning, Simplilearn (Part time)Fullstack Academy · United StatesPart-time Engineering or Architecture Subject Matter Expert, AI Content DeveloperKaplan · Remote · US
First Monday

Get jobs like this every Monday.

One email a week with new remote jobs open to people in Canada. Free, and one click to unsubscribe. Privacy Policy

Or request early access to the app
Apply for this job